Status, 20 November 2026: Punjab Chief Minister Maryam Nawaz Sharif approved Phase 2 of the CM Punjab Solar Panel Scheme at a special meeting on Thursday, 19 November 2026, and directed that the target be raised from 90,000 to 100,000 beneficiaries. Registration follows the same process as Phase 1: the official portal cmsolarscheme.punjab.gov.pk and SMS to 8800. No separate Phase 2 last date has been announced. Check the official portal for the current status before you apply.

CM Punjab Solar Scheme Phase 2 Registration Online: How to Apply

The CM Punjab Solar Scheme Phase 2 is the expanded round of the Punjab free solar programme. Punjab Chief Minister Maryam Nawaz Sharif approved Phase 2 at a special meeting on Thursday, 19 November 2026, and directed that the target be raised from 90,000 to 100,000 beneficiaries. The scheme gives free solar systems to low-use households in Punjab, and registration uses the same official portal and SMS service as Phase 1. This page explains who can apply, how to register online and by SMS, what system you get, and what has not been announced yet.

Key Takeaways

What the CM Punjab Solar Scheme Is

The scheme is the Punjab government free solar programme, also called the Roshan Gharana Solar Scheme. It was launched in December 2024 by Chief Minister Maryam Nawaz Sharif. The government gives a complete solar system free of cost to households that use little electricity, so that their bills fall and they are less affected by load shedding. The system is installed at the home and includes solar panels, an inverter and battery backup. Selection is by computerized balloting, which means no officer can pick names by hand. The official portal is cmsolarscheme.punjab.gov.pk and the official SMS short code is 8800.

The scheme is aimed at domestic consumers. Commercial connections, connections with a sanctioned load above 2 kW and households that use more than 200 units a month do not qualify. In April 2026 the Punjab government extended the scheme to December 2026, because more than 350,000 people had applied. The state news agency APP reported that more than 94,000 systems would be provided at a cost of about Rs10 billion.

What Phase 2 Changes

Phase 2 is an expansion, not a new scheme with new rules. The meeting on 19 November 2026 approved the second phase and raised the target from 90,000 to 100,000 beneficiaries. The Chief Minister also approved, in principle, a pilot project to install 5,000 solar panels in Cholistan and to convert water supply schemes at 40 sites in the region to solar energy. She directed energy audits of all major hospitals and ordered electrical panels to be installed according to their energy needs. The meeting also gave in-principle approval to a pilot project that will generate energy from 3,000 tonnes of waste, and reviewed bioenergy and biofuel projects based on animal, agricultural and solid waste.

The approval was reported by The News, Dunya News, ProPakistani, UrduPoint, Pakistan Today and TechJuice on 19 and 20 November 2026. The briefing at the meeting said Phase 1 received more than 350,000 applications and 89,869 households received solar systems, cutting their electricity bills by about one-third.

Who Can Apply

You qualify if you meet all of these conditions:

Households that use more than 200 units a month, commercial consumers and connections with a sanctioned load above 2 kW do not qualify. If your use is above 200 units, you cannot apply under this scheme even if you live in Punjab.

How to Register Online

Registration for Phase 2 follows the same process as Phase 1. Keep your CNIC and your latest electricity bill ready before you start.

  1. Open the official portal cmsolarscheme.punjab.gov.pk in your browser.
  2. Click Register on the home page.
  3. Enter your CNIC number and your electricity bill reference number. The reference number is printed on your bill.
  4. Enter your mobile number and verify it with the code you receive.
  5. Submit the form and save your tracking or reference number. Take a screenshot so you do not lose it.
  6. Wait for the result of the computerized ballot. Shortlisted applicants are contacted through the portal and SMS.

Registration is free. The portal will not ask you to pay any fee at any step.

How to Register by SMS to 8800

If you do not have internet access, you can register by SMS:

  1. Find the 14-digit reference number on your electricity bill.
  2. Open your messaging app and type your bill reference number, then a space, then your CNIC number without dashes.
  3. Send the message to 8800.
  4. Save the confirmation SMS. It carries your tracking number.

The SMS service is free on all Pakistani networks. Do not send your CNIC or bill number to any other number. Only 8800 is official.

How to Check Your Application Status

Open the official portal cmsolarscheme.punjab.gov.pk and log in with your CNIC to check your application status. Your tracking number from the registration step helps you find your record. If you registered by SMS, the confirmation message you received carries your tracking number. The portal and the 8800 SMS service are the only official ways to check your status. Do not trust a status shown on any other website.

What Solar System You Get

The size of the system depends on your monthly electricity use:

The system includes solar panels, an inverter and battery backup, and it is installed free of cost. The panels and inverter are linked to your CNIC to prevent theft. A 550W system runs basic home loads such as fans, lights and a small TV, while an 1100W system supports more load. The exact appliances you can run depend on the system size and your usage.

What Happened in Phase 1

Phase 1 shows why Phase 2 matters. Registration for the first round closed on 5 January 2025, and beneficiaries were chosen by computerized balloting. More than 350,000 people applied, and 89,869 households received solar systems. The government briefing said those households saw their electricity bills fall by about one-third. In June 2026 the Punjab Energy Minister said about 90,000 households had received systems at a reported cost of around Rs9.7 billion, with more funding proposed for expansion. In April 2026 the scheme was extended to December 2026 to cover the large number of applications.

How to Stay Safe From Scams

Free government schemes attract fake websites and agents. Protect yourself:

What Is Not Announced Yet

Some details for Phase 2 have not been announced, and readers should be careful about claims on social media:

This page will be updated when the Punjab government publishes Phase 2 registration dates or a new notification.

CM Maryam Nawaz Sharif directs an increase in the Solar Panel Scheme Phase 2 target from 90,000 to 100,000
News graphic: CM Maryam Nawaz Sharif directs an increase in the Solar Panel Scheme Phase 2 target from 90,000 to 100,000. Tap the image to view it full screen.

Related on Pak Jobs

Frequently Asked Questions

What is the CM Punjab Solar Scheme Phase 2?

Phase 2 is the expanded round of the Punjab free solar programme, approved by Chief Minister Maryam Nawaz Sharif on 19 November 2026. The target is 100,000 free solar systems for low-use households in Punjab, up from 90,000. Registration uses the same official portal and SMS service as Phase 1.

How do I register online for the solar scheme?

Open cmsolarscheme.punjab.gov.pk, click Register, and enter your CNIC number and electricity bill reference number. Verify your mobile number, submit the form and save your tracking number. You can also send your bill reference number and CNIC to 8800 by SMS. Registration is free.

Who is eligible for a free solar system?

You must live in Punjab and hold a domestic electricity connection with a sanctioned load of up to 2 kW. Your monthly use must be up to 200 units. Households using up to 100 units get a 550W system and those using 101 to 200 units get an 1100W system. Selection is by computerized ballot.

What size solar system will I get?

It depends on your monthly electricity use. Households using 0 to 100 units a month get a 550W system, and households using 101 to 200 units get an 1100W system. The system includes solar panels, an inverter and battery backup, with installation free of cost.

What is the last date to apply for Phase 2?

No new last date for Phase 2 has been announced. Phase 1 registration closed on 5 January 2025, and the official scheme page still shows that date. Do not trust a last date from a random post or video. Check the official portal cmsolarscheme.punjab.gov.pk for the current status.

Sources: reports of the special meeting of 19 November 2026 in The News, Dunya News, ProPakistani, UrduPoint, Pakistan Today and TechJuice; APP report of 13 April 2026 on the extension to December 2026; the official portal cmsolarscheme.punjab.gov.pk. No Phase 2 last date had been announced as of 20 November 2026. Punjab government channels are the final record. Pak Jobs is an independent information website and is not part of the Government of Punjab.

Get Job Alerts on WhatsApp

New advertisements are shared on our WhatsApp channel as soon as they are published. Follow the channel and turn on notifications so you never miss a last date.

Follow Whatsapp Channel